Steakhouse Fitout
Home · Snagging

What the Sign-Off Document Should Say

The signature is not the end of the order. It is the point where the money, the defects and the dates stop being negotiable.

24 Nov 2026 · Snagging

What the paper is actually for

Most sign-off sheets record that furniture arrived. That is the least useful thing they could say, because arrival is visible from the invoice. What the document has to fix is three things: how many units, which ones are still wrong, and what happens to the balance if they stay wrong.

Without those three, the signature transfers all risk to the buyer at the moment of signing and leaves the supplier with an incentive to stop answering the phone. With them, the signature transfers the units and keeps the risk where it belongs until the list closes.

Write it on one page. Two pages is fine. Five pages means nobody reads it, and a document nobody reads is a document that gets signed without being used, which is the same as not having one.

Two copies, signed by both sides, one each. Where the supplier is overseas, a scan on the day and the original by courier is enough, provided the scan is legible and the date is written by hand rather than printed. Documents that arrive pre-dated read as paperwork prepared in advance, and paperwork prepared in advance is what nobody trusts when a line stays open. The same applies to the defect list attached to it: the list that should be signed is the one written on the day, with the pen marks still on it, not a clean version retyped afterwards.

The five fields that matter

One: units received, by model, with the variance from the order. Two: the open defect list, attached and referenced rather than summarised. Three: the retention amount and the conditions that release it. Four: the date each open line will be closed by. Five: who signs for each side, with a name rather than a job title.

Retention is the field that does the work. Five to ten percent held until tier one lines close is standard, and it should be stated as a figure rather than a percentage where the order is small, because ten percent of a small order is not enough money to change anyone's priorities. Where the order runs to six figures, ten percent is more than enough and five is usually accepted without argument.

The date field has to be a date, not "on completion". Every open line gets one, even the cosmetic ones. The line with a date can be chased; the line without one cannot, and chasing is what actually closes a punch list in the end.

What not to sign

Do not sign a sheet that says the furniture was received "in good order and condition" while defects are still open. That phrase is the one a claims department looks for, and it defeats the defect list attached behind it. Sign that units were received, that specific lines remain open, and that the balance is held against those lines.

Do not sign on behalf of somebody who is not there. The signature of a person who has not walked the room is worth less than no signature, because it puts a name against a condition nobody checked. Where the person who can sign is not on site, sign nothing and get the sheet couriered, which takes a day and costs nothing compared with an argument in month two.

Do not accept a verbal commitment as a substitute for the date field. Verbal commitments are how a fitout ends up with twelve open lines and no leverage, and the person who made the commitment will have moved to another site by the time anyone follows up.

After the signature

Photograph the signed sheet and put it in the same folder as the count and the damage photographs. The paper original goes somewhere it can be found in a year, because the retention release depends on it and retention releases are argued about long after everyone has forgotten the project.

Then diarise the open lines against their dates. Nobody else will. The supplier has other orders, the site manager has another fitout, and the only person with an interest in a line closing on time is the person holding the retention. That is not a criticism of anyone; it is what happens when a project ends and the people on it disperse. Diary entries with a name against each date are the whole system, and they cost five minutes on the day the sheet is signed. Anything more elaborate gets abandoned by week two, which is why the simple version is the one that actually survives.

Release retention when the list closes, not when the room opens. The gap between the two is usually three to six weeks, and that gap is the entire reason retention exists. What the release should be tied to is in a punch list that gets fixed, and the evidence a disputed line needs is in the claim window for a damaged unit.

Where the order settles in full at delivery, the count becomes the only record, which is why counting units against the invoice has to be done before the truck leaves. Payment terms decide how much leverage the document carries, and the terms that hold a supplier to a date are set out on the payment terms page.

Cost per unit is the last number anyone looks at and the first one that gets remembered. What a line actually costs once retention, replacement and a second delivery are counted is on the seating cost per unit page, and it is usually a different figure to the one on the quotation.