Counting Units Against the Invoice
The count is not the same as the damage check, and doing both at once is how orders arrive short without anybody noticing until week three.
Count by model, not by pallet
Pallets tell you what the forwarder loaded. Models tell you what you paid for. Forty chairs can arrive on four pallets or on six, and the pallet count will match either way while the chair count is three short. Count the thing you ordered.
Work from the packing list, line by line, with a pen. Each line gets a number ordered, a number received and a tick. Where a line is mixed across two pallets, which happens on any order with more than one chair model, count it at the end rather than per pallet, because per-pallet counting double-counts the second model every time.
Counting by pallet is fast and wrong. On a 130-unit seating order, a line-by-line count takes about forty minutes with two people, one calling and one ticking. That is a third of the time saved by counting pallets, spent once, and it removes the entire class of missing-unit disputes from the project. Where an order ships in one container, count the container as one line and each model inside it as its own line, since a container that arrived complete can still be two chairs short.
Three counts, at three moments
Count at the tailgate before anything is carried in. Count again as units are placed in the room. Count a third time at sign-off. Each count catches a different failure. The tailgate count catches the forwarder, the placement count catches the crew, and the sign-off count catches whatever walked out of the building during the fitout, which on a live site is not nothing.
The second count is the one people skip because the room is obvious. It is also the one that catches the unit the crew put in the wrong zone and the unit that was taken back to the workshop without anyone writing it down. The unit in the wrong zone looks like a missing unit and a surplus elsewhere, and reconciling that after the crew has gone takes a week.
Write the three numbers next to each other on one sheet. Where the tailgate count and the sign-off count agree, the order is settled and nobody needs to think about it again. Where they differ, the placement count tells you which way the error runs.
When a line comes up short
Say it before the truck leaves. The forwarder can check the loading bay while the driver is still on site, and a unit found on the bay is a loading error that costs nothing to fix. The same unit found two days later is a claim nobody can prove, because the only evidence is a count sheet written after the truck left.
Where the truck has gone, photograph the pallet and the packing slip together and send both to the supplier the same day. Suppliers replace short lines far more readily than they replace damaged ones, because a short line is a packing error on their side and a damaged one could be anything. The conversation goes better when the message contains a packing slip number rather than a description.
Do not accept a promise to include the missing units in the next shipment without a date. On a seating order, the next shipment may be a container eight weeks out, and eight weeks without two chairs means two seats closed for the opening. Get a date and put it on the punch list as a tier one line.
Where the missing line is a base rather than a top, the order is not unusable. Bases and tops often ship separately on a large order, and a late base means forty tops on the floor rather than forty tables. That is still a problem, but it is a problem with a different fix, and knowing which one you have on the day decides whether the room opens with forty working tables or none.
Recording it so the claim holds
The count sheet is a document, not a note. Date, delivery note number, who counted, the three counts, and the variance per line with the model code. Anything less and the supplier's office has to reconstruct the shipment from three emails to get started, which is where a fortnight goes.
Keep it with the damage photographs in the same folder. Claims for two missing chairs and claims for two broken ones are settled by different clauses, and the file only works when a reader can tell which is which in ten seconds. What the photographs need to show is set out in photographing freight damage.
The count also settles the invoice. Pay against units received rather than units ordered, and say so on the purchase order before the order is placed. Where payment runs against a deposit and a balance, the balance triggers on the count and the sign-off, both, which keeps the handover walk on the critical path rather than at the end of a fortnight of scheduling.
What a manufacturer's packing list tells you
Factories pack against a list naming model, quantity, carton number and net weight per carton, and a serious steakhouse furniture factory sends that format for approval before the order ships. That list is the reason a count takes forty minutes rather than a morning. Lists that say "chairs, 40 pcs" make every variance a research project, and it is worth asking for the format before the order ships rather than after.
Weights are the quiet check. Where a carton weighs what the list says, the unit inside is probably the unit on the list. Where it weighs 4 kg less, the carton has been opened or the model is wrong, and that shows up at the tailgate without opening anything. The bathroom scale and the packing list catch more than a visual count ever will.
Model codes then tie back to the spec sheet, which is where the height, width and finish of each line are stated. Counting against a code rather than a description is the difference between receiving "40 chairs" and receiving 40 of the model the room was drawn around.